By Trevor Thorn · Published
When planning a house extension, it’s easy to focus on the exciting decisions, such as choosing your new kitchen, bathroom suite and tiles. But have you considered how your new plumbing will connect to your existing system, and how much it could cost?
Plumbing is one of the items that can be difficult to price accurately before building work begins. At Thorn Homes, plumbing is included as a provisional sum in our extension quotations because we can’t always see the condition of the existing pipework until work starts.
In this blog, Trevor Thorn explains why plumbing costs can vary, what a provisional sum means for your budget and how planning your bathroom and kitchen specifications early can help reduce uncertainty.
Why is plumbing a provisional sum?
A provisional sum is an estimated allowance included in your building quotation for work that cannot be accurately priced until more information is available.
With plumbing, the challenge is understanding what’s happening behind your walls, beneath your floors and above your ceilings. Existing pipework may have been altered, extended or repaired several times over the years, and it isn’t always possible to assess its condition before work begins.
On some projects, connecting the new extension to the existing plumbing system is relatively straightforward. Adding a radiator or extending hot and cold water supplies may require very little additional work.
On other projects, once ceilings or floors are opened up, the plumber may discover older pipework, previous alterations or problems that require more extensive changes.
This is why plumbing is generally treated as a provisional item on extension projects. Until the existing system can be properly assessed, there’s an element of uncertainty around the work required and its final cost.
Can you reduce the uncertainty around plumbing costs?
Although you can’t always control the condition of your existing plumbing, there are steps you can take to help make your overall project budget more predictable.
One of the most important is to finalise your layouts and specifications as early as possible.
Knowing where your kitchen sink, bathroom basin, toilet and shower will be positioned helps your builder assess the proposed pipework and drainage requirements.
The type of fittings you choose also makes a difference. Two bathrooms might serve exactly the same purpose, but their installation costs can vary considerably depending on the products and finishes selected.
Your choice of bathroom fittings matters
Before work begins, think about the type of bathroom you want and how the fittings will be installed.
Toilets: A standard floor-mounted toilet is generally more straightforward to install than a back-to-wall or wall-hung toilet with a concealed cistern. Concealed systems can require additional installation work, access provisions and careful coordination with the wall construction.
Basin taps: A standard basin with taps mounted on the basin or worktop will usually be simpler to install than a design requiring concealed pipework and wall-mounted taps.
Showers: Consider whether you want a shower tray or a wet room, whether the shower will be enclosed with a screen or door, and what type of shower system you prefer. These decisions can affect the plumbing, installation and waterproofing requirements.
Kitchen plumbing: Think about the position of your sink, dishwasher, washing machine and any additional appliances that require water supplies or drainage.
Making these decisions early allows your builder to understand the specification and make appropriate allowances in the quotation, rather than trying to accommodate changes later.
Plan your plumbing before building work starts
The earlier you establish your layouts and choices, the easier it is to identify potential complications and costs.
Before committing to your extension, consider:
- Finalising your kitchen and bathroom layouts.
- Choosing your preferred toilets, basins, taps and shower fittings.
- Confirming where appliances requiring water supplies and drainage will be located.
- Discussing any concealed plumbing or wall-mounted fittings with your builder.
- Reviewing the provisional sum in your quotation and understanding what it covers.
If you’re planning a more complex bathroom, wet room or concealed installation, providing this information at the quotation stage is particularly helpful.
Although these steps cannot eliminate every unknown within your existing plumbing system, they can reduce uncertainty around the new installation and help your builder price the work more accurately.
What happens if additional plumbing work is needed?
Once building work begins and the existing plumbing becomes accessible, your contractor can assess what is required to connect the extension safely and effectively.
If the work differs from the original allowance, the cost will need to be reviewed and any additional work dealt with in accordance with your contract.
This is why it’s important to understand provisional sums before your project starts and to allow some flexibility in your overall budget.
Planning an extension? Get the details right early
Plumbing is one of those areas where some uncertainty is unavoidable, but good preparation can still make a difference.
At Thorn Homes, we encourage homeowners to think beyond the overall layout and consider the practical details of how they want their new space to work. Knowing your preferred fittings, layouts and specifications helps us build a clearer picture of the project and the costs involved.
Watch Trevor’s video above to find out more about why plumbing is treated as a provisional sum on extension projects and how your choice of bathroom fittings can affect your budget.
If you’re considering a house extension or renovation, get in touch with Thorn Homes to discuss your plans.