Understanding building jargon

Permitted development, first fix, roof lantern, Build Assure: a plain-English guide to the terms you'll hear on a build.

By Thorn Homes · Published

Planning permission & permitted development

Planning permission is the council's approval for the look, size and position of your extension. Permitted development is the set of rules that let you build certain extensions without applying, within size limits and not in every area.

Building regulations & Building Control

Separate from planning, building regulations set the technical standards for structure, fire safety, insulation, drainage and electrics. Building Control inspects the work at key stages and issues a completion certificate you'll need when you sell.

First fix and second fix

First fix is everything that happens before plastering: wiring, pipework, stud walls, door frames. Second fix is what goes in afterwards: sockets, switches, radiators, skirting, doors, kitchen and bathroom fittings.

Roof lantern, bi-folds and Crittall doors

A roof lantern is a glazed structure set into a flat roof to flood the room with light. Bi-fold doors concertina back to open a whole wall to the garden. Crittall-style doors are slim steel-framed glazed doors with a characteristic grid of panes.

Snagging, retention and Build Assure

Snagging is the final check for small defects before handover. A retention is a small percentage held back until snags are fixed. Build Assure provides structural warranties for new homes; Thorn Homes is approved to provide a 10-year Build Assure structural warranty on its new builds.